We review your project, confirm materials, and align with your vision before sharing details with our development team (1–2 weeks).
We create and approve detailed technical drawings, coordinate engineering systems, and order materials (3–4 weeks).
We manufacture house components and prepare them for transport based on approved plans (1–2 weeks).
We assemble your home on-site, ensuring precision and quality every step of the way.
We inspect the home, confirm its quality, and hand it over for final finishing steps.
Every successful project begins with a clear understanding of your vision and requirements. In this initial stage, we take the time to familiarize ourselves with your project by discussing your ideas, needs, and goals in detail. Whether you already have specific plans or are just starting to explore your options, we’ll help you define a clear direction.
Our team carefully analyzes the project materials and reviews them with you to ensure every element aligns with your vision. We’ll discuss your preferences for design, materials, and functionality to create a roadmap for the project. This collaborative process ensures that we’re fully aligned from the start, minimizing potential misunderstandings later.
Once we’ve gathered all the necessary information, we share the details with our internal team to set the project development process in motion. This step typically takes 1–2 weeks and forms the foundation for a seamless and efficient journey toward your dream home.
At this stage, we move from concept to detailed planning. Our team prepares comprehensive technical drawings and component plans that serve as the blueprint for your home. These drawings include structural details, connections, and material specifications, ensuring that every element of the design is accounted for.
Once the initial drafts are ready, we review them with you to confirm they meet your expectations and make any necessary adjustments. We also coordinate with other engineering systems, such as plumbing, electrical, and HVAC, to ensure compatibility and efficiency across all aspects of the project.
In parallel, we finalize material orders based on the approved drawings, ensuring that everything is ready for the production phase. This step is vital for avoiding delays and maintaining the project’s momentum. Typically, this process takes 3–4 weeks.
With the planning phase complete, we shift focus to the production of your home’s components. Using the finalized drawings, our skilled team begins manufacturing the panels and other structural elements in our state-of-the-art facility. This controlled environment ensures precision and protects the materials from environmental damage, maintaining their integrity and quality.
We carefully allocate materials, ensuring that every component meets the highest standards. Once the panels are manufactured, they are thoroughly inspected and prepared for safe transportation to the construction site. Special care is taken to package the components securely, preventing any damage during transit.
This stage, which typically takes 1–2 weeks, is critical for setting the stage for efficient on-site assembly. By the end of this step, every element of your home is ready to be brought together seamlessly.
The on-site assembly stage is where your home truly begins to take shape. Our experienced construction team carefully assembles the components, following the approved plans to ensure precise alignment and structural integrity. This step is carried out with meticulous attention to detail, ensuring that every element fits together perfectly.
The process begins with verifying foundation measurements and heights before using an auto crane to position the panels directly from transportation. Throughout the assembly, we use advanced insulation and fastening technologies to ensure airtightness, energy efficiency, and long-term durability.
The assembly progresses systematically, starting with ground-floor walls, partitions, and first-floor walls, followed by rim beams, purlins, and roof panels. Depending on the design, roof panels may be delivered pre-assembled or in separate parts. Despite its complexity, this stage is typically completed within 3–5 days, resulting in a fully assembled and weather-tight structure.
The final step ensures that every aspect of your home meets the highest standards of quality and aligns with the approved drawings. Our team conducts a thorough inspection of the building, checking structural elements, insulation, and finishes to confirm that everything is in place and built to specification.
Once the inspection is complete, we walk you through the results, addressing any questions or concerns you may have. This transparent process ensures you’re confident in the quality of your home. After you’re satisfied, we finalize the handover by signing the acceptance act, officially transferring the house to you.
From there, your home is ready for the final finishing processes, such as interior decoration and landscaping. This step marks the completion of your project and the beginning of life in your new home.